Electrical Safety Type 2 Switchgear

Prepare and disconnect the cell on high-voltage switchgear safely.

You will learn how to prepare for work on the switchgear, how to put on the necessary PPE, check the work permit, prepare the tools and the equipment, and disconnect and remove the switchgear cell.

*Training available in multiple languages

Developer:
Users:
Single
Headset Availability:
Oculus Quest 1, 2, Pro, HTC Focus 3, Pico Neo 3, 4, HTC Vive
What You'll Learn

In the VR simulator, you will learn how to:

  • Prepare for the work on switchgear
  • Put on the necessary PPE
  • Check the work permit
  • Prepare the tools
  • Prepare the equipment
  • Disconnect and remove the switchgear cell
  • Move the cell and the tools to the repair point and finish the task with the foreman.

The VR Experience

The training will start with taking and signing the work permit and putting on the necessary PPE. After that you will collect the tools needed for the task and transport them on the cart to you task location. When you are near the switchgear you will have to provide all the procedure for the safe disconnection of the cell. It includes placing the warning signs, checking the voltage, shutting down the equipment part by part, and using different keys and tools. After the shutdown, you will use special cart to withdraw the cell and move it away from the container.